• PORTFOLIO
  • Our Practice
  • Services
  • News
  • Contact Us
RKG
  • PORTFOLIO
  • Our Practice
  • Services
  • News
  • Contact Us

Norwich Station, Trainshed Roof

Feasibility Options for refurbishment of Existing Train Shed and Side Porte-Cochere

The existing Norwich railway station trainshed and side porte-cochere roofs are in poor condition. RKG acting as Lead consultants and Architects undertook feasibility options report  for a GRIP (Governance for Railway Investment Projects) Stage 3 ‘Option Selection’ to evaluate the potential of introducing replacement material and finishes to the existing trainshed roof and side porte-cochere roof.

The objectives of the report in conjunction with the brief are as follows:

•Assess options for the proposed replacement of materials and finishes to the main trainshed roofs, to the main trainshed upper gable end, and the side porte-cochere roof.

•Assess the colour scheme and redecoration of the existing trainshed and side porte-cochere structures.

•Assess gutter repair and lining options

•Assess scaffolding - multi purpose protection

•Assess fall protection systems / safe access systems

View fullsize 01 Image.jpg
View fullsize 02 Image.JPG
View fullsize 03 Image.jpg
View fullsize 04 Image.jpg
View fullsize 05 Image.JPG
View fullsize 06 Image.jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: feasibility
Monday 07.29.24
Posted by Kevin Stocker
Newer / Older