Working closely with the Client we offer a full service from conception and feasibility to planning and building control submissions and tender. We can also provide construction drawings working with the Contractor.
As part of the feasibility stage we will support the Client via a Pre-Application with the local Authority and supporting documentation required to meet the planning submission requirements. Using the correct layouts (based on recommended standards) allows the design to provide a functional use. We can also provide visualisations and street scenes to help the Client fully appreciate the design, materials and massing.
The proposed development was for the demolition of the existing public house and its replacement on a similar footprint with a 3 and 4 storey building comprising of 11 number 1, 2 and 3 bedroom flats (including 1 flat on the ground floor which can be easily adaptable to a fully accessible wheelchair unit), cycle and refuse storage including recycling.
Robinson Kenning & Gallagher were introduced to this project at an early planning stage to work with the contractor - Durkan, Housing Association and other consultants to construct the affordable housing element of the residential part of the redevelopment to create the new Arsenal football ground named The Emirates.
Robinson Kenning & Gallagher were initially commissioned by Spurgeon’s College to prepare design proposals for key worker accommodation blocks on a previous Petrol Station which fronted onto the busy A Road, South Norwood Hill.
Robinson Kenning & Gallagher were initially commissioned by the Housing Trust to prepare design proposals for the site and subsequently by Mizen Design / Build Ltd who were contracted to develop the site.