Barn Conversion in Somerset Conservation Area for a Private Client
Robinson Kenning & Gallagher were employed by a private client to approve planning conditions and produce a construction drawing package for a high specification barn conversion in Bath, Somerset. The barn, located in a conservation area (on a sloping site in the grounds of a large historic house) needs complete renovation. Bats found living in the barn were accommodated in the new design with new housing as careful attention was given to all Ecology issues.
The accommodation includes: Double height entrance/living space with gallery, dining/kitchen, 3no. Bedrooms over two floors, bathrooms and an adjoining wing (also original) with an indoor swimming pool, jacuzzi, sauna, mezzanine gym and changing facilities. The design package needed to meet exacting client standards whilst balancing retaining original barn features with modern living standard upgrades. The 3D visualisation images produced by RKG provided the client, with a design aide both internally and externally.
The proposed development was for the demolition of the existing public house and its replacement on a similar footprint with a 3 and 4 storey building comprising of 11 number 1, 2 and 3 bedroom flats (including 1 flat on the ground floor which can be easily adaptable to a fully accessible wheelchair unit), cycle and refuse storage including recycling.
Robinson Kenning & Gallagher were introduced to this project at an early planning stage to work with the contractor - Durkan, Housing Association and other consultants to construct the affordable housing element of the residential part of the redevelopment to create the new Arsenal football ground named The Emirates.
Robinson Kenning & Gallagher were initially commissioned by Spurgeon’s College to prepare design proposals for key worker accommodation blocks on a previous Petrol Station which fronted onto the busy A Road, South Norwood Hill.
Robinson Kenning & Gallagher were initially commissioned by the Housing Trust to prepare design proposals for the site and subsequently by Mizen Design / Build Ltd who were contracted to develop the site.