BDM, Beckton

Robinson Kenning & Gallagher were appointed as Architects and Project Managers to design the new warehouse and distribution centre, with offices and technical facilities for Bridgewater Distribution & Management as part of their relocation in preparation for the London 2012 Olympics.

Read more

categories: Industrial
Sunday 09.30.18
Posted by 3B Digital
 

Beam Reach, Stratford

Robinson Kenning & Gallagher were appointed as Architects and Project Managers to design this new building with associated offices and amenities for Newsfax International as part of the Olympic relocation Masterplan by the LDA. Beam Reach 5 Business Park, plots 7 and 8 are approximately 2.06 hectares in area.

Read more

categories: Industrial
Saturday 09.29.18
Posted by 3B Digital
 

Sandiacre, Nottingham

New Distribution Centre for Network Rail, Nottingham for Network Rail

Robinson Kenning & Gallagher were appointed by Network Rail to provide Contract Administrator and Principal Designer Services for a new distribution centre for Network Rail. The project relates to the provision of a central storage facility at Sandiacre High Output Operating Base (‘HOOB’), Toton siding, Nottingham. The site (originally occupied by an engine shed) was mostly wasteland within one of the largest rail depots in the United Kingdom. The main contractor was Dyer & Butler.

RKG were employed for the following project stages for the Design & Build project: Feasibility Stages (Grip 1-3), Design and Tender (Grip 4-5) and Management of the works on site to completion (Grip 6-8).  Project time constraints meant careful management of long ‘lead times’ was required so that items arrived on-site at the appropriate time. After laying the building foundations the contractor managed to assemble the warehouse in just seven days. In total the project moved from a contaminated railway sliding to distribution centre in just sixty-six working days.

View fullsize 02 Image.jpg
View fullsize 01 Image.jpg
View fullsize 03 Image.jpg
View fullsize 04 Image.jpg
View fullsize 05 Image.jpg
View fullsize 06 Image.jpg
View fullsize 07 Image.jpg
View fullsize 08 Image.jpg

OTHER INDUSTRIAL CASE STUDIES:

Featured
BDM, Beckton
BDM, Beckton
Beam Reach, Stratford
Beam Reach, Stratford
Sandiacre, Nottingham
Sandiacre, Nottingham
Almond Road, Bermondsey
Almond Road, Bermondsey
London Stone, Battersea
London Stone, Battersea
Kesslers International, Stratford
Kesslers International, Stratford
Ramsgate Depot, Kent
Ramsgate Depot, Kent
Focal Point, Dover
Focal Point, Dover
categories: Industrial
Friday 09.28.18
Posted by Kevin Stocker
 

Almond Road, Bermondsey

A sensitive refurbishment project to regenerate staff & public areas on all floors at Woking Civic offices.

Read more

categories: Industrial
Friday 09.28.18
Posted by 3B Digital
 

London Stone, Battersea

A sensitive refurbishment project to regenerate staff & public areas on all floors at Woking Civic offices.

Read more

categories: Industrial
Friday 09.28.18
Posted by 3B Digital
 

Kesslers International, Stratford

Robinson Kenning & Gallagher were appointed as Architects and Project Managers to design the new warehouse and distribution centre, with offices and technical facilities for Bridgewater Distribution & Management as part of their relocation in preparation for the London 2012 Olympics.

Read more

categories: Industrial
Thursday 09.27.18
Posted by 3B Digital
 

Ramsgate Depot, Kent

Under Network Rails Station Regeneration Project, Robinson Kenning & Gallagher were instructed to develop an “Image Guide” by the Network Rail Regional Architect.

Read more

categories: Industrial
Wednesday 09.26.18
Posted by 3B Digital
 

Focal Point, Dover

RKG were invited by the Contractor to join their Design and Build team of project consultants to develop this site for HM Customs and Excise as a holding pound for illegal imports.

Read more

categories: Industrial
Tuesday 09.25.18
Posted by 3B Digital