Clapham Junction, London

Clapham Junction Station Improvements for Network Rail and Stagecoach South West Trains

Network Rail in conjunction with Stagecoach South West Trains approached RKG to provide a Grip 3 feasibility study for undertaking design concepts for Station improvements at Clapham Junction Station. The Scope of Works were defined by Network Rail and Stagecoach South West Trains.

The main areas within the Scope of Works consisted of:

Overbridge
Platforms 9/10
Platforms 11/12
Platforms 13/14
Grant Road Entrance
Brighton Yard Building
Subway

The objective of the study was to identify possible improvement options and provide Clapham Junction Station with an identity of facilitating an improved movement of passengers whilst providing 21st century facilities and environment.

The Grip 3 report included initial Structural and M&E analysis, along with construction cost analysis to ±30% including possession costs and working during engineering hours.

Project Value: £50m

View fullsize KEY PLAN - OVERBRIDGE.jpg
View fullsize KEY PLAN - ALL.jpg
View fullsize parallel2 copy.jpg
View fullsize R9-10_external 06.jpg
View fullsize R9-10_overview 01.jpg
View fullsize 03a.jpg
View fullsize 9a.jpg
View fullsize export_08.jpg

Other Transport Case Studies:

Featured
Norwich Station, Trainshed Roof
Norwich Station, Trainshed Roof
Read more →
Stoke MDU, Stoke
Stoke MDU, Stoke
Read more →
Bury St. Edmunds Station, Suffolk
Bury St. Edmunds Station, Suffolk
Read more →
Amersham Station, London
Amersham Station, London
Read more →
Harrow-on-the-Hill, London
Harrow-on-the-Hill, London
Read more →
Dartford Station, Kent
Dartford Station, Kent

Initial concept design Grip Stage 5 working drawings of a New Major Interchange Station at Dartford, incorporating new retail, passenger and station staff administration facilities. In association with the scheme the existing car parking was also developed to increase the number of parking spaces and improve Disabled parking and its proximity to the new station.

Read more →
Earlsfield Station, London
Earlsfield Station, London

Earlsfield Station is the busiest small station in London, experiencing huge volumes of passenger flow during peak hours.

Read more →
Basingstoke Station, Hampshire
Basingstoke Station, Hampshire

Robinson Kenning & Gallagher prepared scheme proposals, working drawings, and invitation to tender documents for the development of this South West Trains flagship station at Basingstoke. RKG were also employed to act as Project Managers and Supervisors under the NEC 3 contract.

Read more →
Euston Station, London
Euston Station, London
Read more →
Cycle Hubs, South West England
Cycle Hubs, South West England

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more →
London Bridge: Maintenance Facility, London
London Bridge: Maintenance Facility, London

Robinson Kenning & Gallagher were employed from Grip stage 2 ñ 8 working closely with Balfour Beatty Rail, Network Rail and the End User.

Read more →
Clapham Junction Station: Brighton Yard, London
Clapham Junction Station: Brighton Yard, London

This original entrance to the station had become congested and the pedestrian flow of passenger through the subway was being restricted by the existing gateline and limited circulation space.

Read more →
Southampton Station, Hampshire
Southampton Station, Hampshire
Read more →
Kensal Rise and South Tottenham Overground Stations, London
Kensal Rise and South Tottenham Overground Stations, London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the station. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Paddington Station: Waiting Room, London
Paddington Station: Waiting Room, London

RKG were employed to produce the architectural detailed design and Form 003 submission along with the overall coordination of Structural, Mechanical & Electrical †and Signage for the new public waiting room.

Read more →
Clapham Junction: St John's Hill Entrance, London
Clapham Junction: St John's Hill Entrance, London
Read more →
Charing Cross Station, London
Charing Cross Station, London
Read more →
Clapham Junction: Platform 9/10, London
Clapham Junction: Platform 9/10, London
Read more →
Worcester Park and New Malden Stations, South London
Worcester Park and New Malden Stations, South London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the stations. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Ilford Station: Public Toilets & Waiting Room, London
Ilford Station: Public Toilets & Waiting Room, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
Kings Cross Station: Roof, London
Kings Cross Station: Roof, London

Robinson Kenning & Gallagher produced a Listed Building Application with WYG on behalf of our clients Network Rail. Network Rail is proposing to refurbish and upgrade Kings Cross Station. This Application related to the proposed renewals work and specifically to the Main Train Shed which comprises of two separate barrels roof separated by a central spine wall.

Read more →
Victoria Station: Eastern Barrel Roofs, London
Victoria Station: Eastern Barrel Roofs, London

Robinson Kenning & Gallagher acted as Heritage consultants for the mains contractor for the re-roofing of the Eastern Kent side Concourse of London Victoria Station.

Read more →
Blackhorse Road Station, London
Blackhorse Road Station, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →