• PORTFOLIO
  • Our Practice
  • News
  • Services
  • Contact Us
RKG

Architecture and Building Surveying

  • PORTFOLIO
  • Our Practice
  • News
  • Services
  • Contact Us

Paddington Station: Waiting Room, London

New Public Waiting Room

Robinson Kenning & Gallagher were employed by Network Rail to produce the Architectural detailed design package and Form 003 submission for a new public waiting room in Paddington Station. In addition, RKG provided project coordination services of the Structural, Mechanical & Electrical, and signage packages. Working in close relationship with both the Client and Contractor RKG were able to identify and resolve all design and on-site queries expediently.

View fullsize 01 Image.jpg
View fullsize 02 Image.jpg
View fullsize P1040078.jpg

Other Transport Case Studies:

Featured
Norwich Station, Trainshed Roof
Norwich Station, Trainshed Roof
Read more →
Stoke MDU, Stoke
Stoke MDU, Stoke
Read more →
Bury St. Edmunds Station, Suffolk
Bury St. Edmunds Station, Suffolk
Read more →
Amersham Station, London
Amersham Station, London
Read more →
Harrow-on-the-Hill, London
Harrow-on-the-Hill, London
Read more →
Dartford Station, Kent
Dartford Station, Kent

Initial concept design Grip Stage 5 working drawings of a New Major Interchange Station at Dartford, incorporating new retail, passenger and station staff administration facilities. In association with the scheme the existing car parking was also developed to increase the number of parking spaces and improve Disabled parking and its proximity to the new station.

Read more →
Earlsfield Station, London
Earlsfield Station, London

Earlsfield Station is the busiest small station in London, experiencing huge volumes of passenger flow during peak hours.

Read more →
Basingstoke Station, Hampshire
Basingstoke Station, Hampshire

Robinson Kenning & Gallagher prepared scheme proposals, working drawings, and invitation to tender documents for the development of this South West Trains flagship station at Basingstoke. RKG were also employed to act as Project Managers and Supervisors under the NEC 3 contract.

Read more →
Euston Station, London
Euston Station, London
Read more →
Cycle Hubs, South West England
Cycle Hubs, South West England

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more →
London Bridge: Maintenance Facility, London
London Bridge: Maintenance Facility, London

Robinson Kenning & Gallagher were employed from Grip stage 2 ñ 8 working closely with Balfour Beatty Rail, Network Rail and the End User.

Read more →
Clapham Junction Station: Brighton Yard, London
Clapham Junction Station: Brighton Yard, London

This original entrance to the station had become congested and the pedestrian flow of passenger through the subway was being restricted by the existing gateline and limited circulation space.

Read more →
Southampton Station, Hampshire
Southampton Station, Hampshire
Read more →
Kensal Rise and South Tottenham Overground Stations, London
Kensal Rise and South Tottenham Overground Stations, London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the station. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Paddington Station: Waiting Room, London
Paddington Station: Waiting Room, London

RKG were employed to produce the architectural detailed design and Form 003 submission along with the overall coordination of Structural, Mechanical & Electrical †and Signage for the new public waiting room.

Read more →
Clapham Junction: St John's Hill Entrance, London
Clapham Junction: St John's Hill Entrance, London
Read more →
Charing Cross Station, London
Charing Cross Station, London
Read more →
Clapham Junction: Platform 9/10, London
Clapham Junction: Platform 9/10, London
Read more →
Worcester Park and New Malden Stations, South London
Worcester Park and New Malden Stations, South London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the stations. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Ilford Station: Public Toilets & Waiting Room, London
Ilford Station: Public Toilets & Waiting Room, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
Kings Cross Station: Roof, London
Kings Cross Station: Roof, London

Robinson Kenning & Gallagher produced a Listed Building Application with WYG on behalf of our clients Network Rail. Network Rail is proposing to refurbish and upgrade Kings Cross Station. This Application related to the proposed renewals work and specifically to the Main Train Shed which comprises of two separate barrels roof separated by a central spine wall.

Read more →
Victoria Station: Eastern Barrel Roofs, London
Victoria Station: Eastern Barrel Roofs, London

Robinson Kenning & Gallagher acted as Heritage consultants for the mains contractor for the re-roofing of the Eastern Kent side Concourse of London Victoria Station.

Read more →
Blackhorse Road Station, London
Blackhorse Road Station, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
categories: Transport
Tuesday 08.06.19
Posted by 3B Digital
Newer / Older