Bristol Temple Meads Eastern Entrance, Bristol

New Eastern Passenger Entrance at Bristol Temple Meads Station for Network Rail 

Working with Crouch Waterfall as part of the design team for BAM Nuttall, Robinson Kenning & Gallagher are undertaking the Planning, Listed Building and working/construction drawing package for a new Eastern pedestrian access and subway extension scheme at Bristol Temple Meads station, Bristol.

Set within the context of the existing Isambard Kingdom Brunel designed Grade 1 Listed Station the new entrance forms part of a wider strategy to redevelop the ‘Temple Quarter’ as part of a new campus for the University of Bristol. After a delicate planning process, approval was granted and Planning Conditions discharged.

BAM Nuttall were the main contractor delivering these works for Network Rail. Completed 2024.

View fullsize 01 Image.jpg
View fullsize 02 Image.jpg
View fullsize 03 Image.jpg
View fullsize 04 Image.jpg
View fullsize 05 Image.jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
IMG_9369 s.JPEG
IMG_9384 s.JPEG
IMG_9790 s.JPEG
IMG_9818 s.JPEG
IMG_9819 s.JPEG
IMG_9821 s.JPEG
IMG_9827 s.JPEG
IMG_9831 s.JPEG
categories: Transport
Wednesday 10.14.26
Posted by Kevin Stocker
 

Paddington Station: Reception, London

Refurbishment of a glazed retail unit into a new Accessible Reception Lounge facility on the London Paddington Station concourse.

The project was the refurbishment and fit-out of an existing 100sqm glazed retail unit into a new Accessible Reception Lounge facility in the concourse at Paddington station. This contained new seating, desk, accessible WCs, first aid room and staff areas. RKG were employed by structural engineers Crouch Waterfall and contractor Centregreat Rail to provide an updated detail design package (inherited from another consultant) and coordination of structural, MEP, services and accessibility consultants. Completed 2026.   

View fullsize 01 Image.JPG
View fullsize 02 Image.JPG
View fullsize 03 Image.JPG
View fullsize 04 Image.JPG
View fullsize 05 Image.jpg

OTHER COMMERCIAL CASE STUDIES:

Featured
Arklow Road Arches, Lewisham
Arklow Road Arches, Lewisham
Read more →
Raymouth Road Arches, Southwark
Raymouth Road Arches, Southwark
Read more →
Squibb Group, Essex
Squibb Group, Essex
Read more →
Burrell Street Arches, Southwark
Burrell Street Arches, Southwark

This Network Rail Arch refurbishment project to provide high class flexible office accommodation to Network Rail's own Let Estate, Construction & Maintenance Teams.

Read more →
Kesslers International, London
Kesslers International, London

Robinson Kenning & Gallagher were appointed to act as Architects on this Design and Build Contract.

Read more →
SDC11891.JPG
Kings Cross Package 11, London
Read more →
Devonshire House, London
Devonshire House, London

Robinson Kenning & Gallagher were appointed to act as Architects on this Design and Build Contract.

Read more →
Malcolm Place, Tower Hamlets
Malcolm Place, Tower Hamlets

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more →
Goding Street, Vauxhall
Goding Street, Vauxhall
Read more →
Crosfield House, Croydon
Crosfield House, Croydon
Read more →
categories: Transport
Monday 10.12.26
Posted by Kevin Stocker
 

Bury St. Edmunds Station (Cycle Hub), Suffolk

Station Improvement Works for Greater Anglia

Robinson Kenning & Gallagher have been working with Greater Anglia at Grade 2 Listed Bury St Edmunds Station on an number of improvement projects. These have included the reconfiguration of the existing booking hall and a new northern entrance. Currently we are working on improving the cycle storage facilities for the northern entrance.

The works involve co-ordination with other design disciplines to produce a design that future proofs the station whilst protecting the new works from the inherent challenges of working on a listed building where the accommodation is mostly located beneath overhead tracks.

View fullsize 01 Image.jpg
View fullsize 04 Image.jpg
View fullsize 02 Image.jpg
View fullsize 03 Image.jpg
View fullsize 05 Image.JPG
View fullsize 06 Image.JPG

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport
Sunday 02.02.25
Posted by Kevin Stocker
 

Cambridge CyclePoint, Cambridge

Cambridge CyclePoint, Cambridge Station

RKG are working with Greater Anglia to improve security and accessibility at the Cyclepoint facility adjacent to Cambridge Train Station. The facility was opened in 2017 and provides storage space for 2850 cycles over three floors and is the largest storage facility of it’s kind in the UK.

The works in partnership with Sustrans, Brookgate, Cambridge City Council, Cambridge Police and the Greater Cambridge Partnership is part of a broader £3m million package of funding from Active Travel England, the Government’s new cycling and walking exectutive agency, which is aimed at improving cycling infrastructure at train stations across the country.

The improvements consist of upgraded storage, increased cargo bike facilities, improved accessiblity cycle parking and secure areas.      

View fullsize 01 Image.JPG
View fullsize 02 Image.jpg
View fullsize 03 Image.JPG
View fullsize 04 Image.jpg
View fullsize 05 Image.JPG
View fullsize 06 Image.JPG
View fullsize 07 Image.jpg
View fullsize 08 Image.JPG

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport
Wednesday 01.01.25
Posted by Kevin Stocker
 

Amersham Station, Buckinghamshire

New Step-Free Access for London Underground

Robinson Kenning & Gallagher were appointed as Sub-Consultants to provide architectural design elements to Amersham station as part of the Access for All scheme. Working with the Lead Consultant (Ramboll) as part of Taylor Woodrow/BAM Nuttall design team a new overbridge with two lift towers and staff-access staircase was been designed.

The new overbridge and lift towers were sighted at the west end of the Station and form a new free-standing structure. The new overbridge and lift towers provide access from Platform 3 (main Station entrance side) to the island platform (platforms 1 and 2). A staff access staircase was also provided for maintenance and emergency use.

The design and location of the new lift towers and overbridge was carefully considered to achieve not only the best operational location but also visual impact on the existing single storey station building.

Taylor Woodrow/BAM Nuttall were the main contractor delivering these works for London Underground. Website images of construction provided by Taylor Woodrow/BAM Nuttall.

View fullsize 13-01-2020 (70).jpg
View fullsize 13-01-2020 (3).jpg
View fullsize 13-01-2020 (18).jpg
View fullsize 13-01-2020 (5).jpg
View fullsize 13-01-2020 (50).jpg
View fullsize 13-01-2020 (54).jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport, Access for All
Tuesday 12.31.24
Posted by Kevin Stocker
 

Harrow-on-the-Hill, Harrow

New Step-Free Access for London Underground

Robinson Kenning & Gallagher were appointed as Sub-Consultants to provide architectural design elements as part of the Access for All scheme for this station in north London. Working with the Lead Consultant Ramboll as part of Taylor Woodrow/BAM Nuttall design team to design and detail a new link bridge with three lift towers and direct access to the elevated booking hall.

The new link bridge and lift towers provide step free access to platforms 1-6. Access to the new link bridge is via a new formed opening in the booking hall.

Access from the northern end of the station has also been addressed by a new lift providing access from street level to Booking Hall level. A new dedicated passenger route was created to link this lift to the booking hall.

The design and location of the new lift towers and link bridge has been carefully considered to achieve not only the best operational location.

Taylor Woodrow/BAM Nuttall were the main contractor delivering these works for London Underground. Website images of construction provided by Taylor Woodrow/BAM Nuttall.

View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5566.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5646.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5647.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5390.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5402.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5525.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5657.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5670.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5708.JPG
View fullsize 080222 BAM Nuttall Harrow on the Hill jz543A5757.JPG

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport, Access for All
Thursday 01.18.24
Posted by Kevin Stocker
 

St Erth, Cornwall

Access For All, Footbridge and Lifts

RKG worked alongside Crouch Waterfall, Network Rail and BAM Nuttall to deliver a new replacement pedestrian bridge link between platforms with platform lifts at either end, that also introduced access from the station car park below.

The design was inherited from another consultant, and RKG were appointed to navigate the challenging Listed Building and Planning consents and to produce a detail design package alongside Crouch Waterfall.

The new footbridge and lift shafts were designed with steel frame, masonry, Accoya timber and zinc cladding. The original Grade II Listed platform bridge was removed to a heritage museum as part of the works. Completed in 2025.

View fullsize IMG_6270.jpeg
View fullsize 20250310_113433.jpg
View fullsize IMG_6275.jpeg
View fullsize 250217 002 (2).jpg
View fullsize 01 View.jpg
View fullsize 02 View.jpg
View fullsize 03 View.jpg
View fullsize 04 View.jpg
View fullsize 05 View.jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Access for All, Transport
Wednesday 01.17.24
Posted by Kevin Stocker
 

Stoke MDU, Stoke

Stoke MDU, Stoke

The Stoke MDU Project for Network Rail on behalf of Cleshar Contracts Services Ltd. and Crouch Waterfall, consisted of two new buildings, a 450m² warehouse with associated offices and WC facilities and a single storey office building. The office building includes office space, meeting rooms, changing facilities and mess area/seminar room. The project also included a complete redesign of the site and therefore storage areas and parking facilities. The office building was designed using SIP’s (Structural Insulated Panel System) and was completed on site in 2022.

View fullsize 01 Stoke.jpg
View fullsize 02 Stoke.JPG
View fullsize 03 Stoke.jpg
View fullsize 04A image.jpg
View fullsize 04 Stoke.jpg
View fullsize 04a Stoke 5a.jpg
View fullsize 05 Stoke.jpg
View fullsize 05a Stoke.jpg
View fullsize 06 Stoke.jpg
View fullsize 07 Stoke.jpg
View fullsize 07a Stoke.jpg
View fullsize 08 Stoke.jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport
Tuesday 01.16.24
Posted by Kevin Stocker
 

Bury St. Edmunds Station, Suffolk

Station Entrance Works for Greater Anglia

Robinson Kenning & Gallagher are delighted to announce we have been employed by Greater Anglia to produce a Detail Design Architectural Drawings and Heritage Statement for the reconfiguration of the existing booking hall and new northern entrance area of Bury St. Edmunds Station, Suffolk.

The works involve co-ordination with other design disciplines to produce a design that future proofs the station whilst protecting the new works from the inherent challenges of working on a listed building where the accommodation is mostly located beneath overhead tracks.

View fullsize 01 image.jpg
View fullsize 02 image.jpg
View fullsize 03 image.jpg
View fullsize 04 image.jpg
View fullsize 05 image.jpg
View fullsize 06 image.jpg
View fullsize 07 image.jpg
View fullsize 08 image.jpg
View fullsize 09 image.jpg
View fullsize 10 image.jpg
View fullsize 11 image.jpg

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport
Tuesday 01.16.24
Posted by Kevin Stocker
 

Purley Station, Croydon

Car Parking Options for Network Rail

Network Rail have appointed Robinson Kenning & Gallagher to investigate the possibility of providing additional car parking at Purley Station to the South Entrance side. RKG have produced a Feasibility Report identifying options for the increase in parking and providing footpath access. These options also allow for electric charging spaces, additional disabled and short stay spaces.

Project Value: TBC

View fullsize 01 Image.JPG
View fullsize 02 Image.JPG
View fullsize 03 Image.JPG
View fullsize 04 Image.JPG

OTHER LIVE PROJECT CASE STUDIES:

Featured
CPE Teeside and Sleaford Plants
CPE Teeside and Sleaford Plants
Read more →
ChristChurch Banstead, Extension
ChristChurch Banstead, Extension
Read more →
Trafalgar Arches, Brighton
Trafalgar Arches, Brighton
Read more →
Empress Street Arches, Southwark
Empress Street Arches, Southwark
Read more →
categories: Transport
Thursday 09.01.22
Posted by Kevin Stocker
 

Dartford Station, Kent

Initial concept design Grip Stage 5 working drawings of a New Major Interchange Station at Dartford, incorporating new retail, passenger and station staff administration facilities. In association with the scheme the existing car parking was also developed to increase the number of parking spaces and improve Disabled parking and its proximity to the new station.

Read more

categories: Transport, Access for All
Thursday 08.15.19
Posted by 3B Digital
 

Earlsfield Station, Wandsworth

Earlsfield Station is the busiest small station in London, experiencing huge volumes of passenger flow during peak hours.

Read more

categories: Transport, Access for All
Wednesday 08.14.19
Posted by 3B Digital
 

Basingstoke Station, Hampshire

Robinson Kenning & Gallagher prepared scheme proposals, working drawings, and invitation to tender documents for the development of this South West Trains flagship station at Basingstoke. RKG were also employed to act as Project Managers and Supervisors under the NEC 3 contract.

Read more

categories: Transport
Tuesday 08.13.19
Posted by 3B Digital
 

Euston Station: Concourse, London

View fullsize 01 Image.jpg
View fullsize 02 Image.jpg
View fullsize 03 Image.jpg
View fullsize 04 Image.jpg
View fullsize 05 Image.jpg
View fullsize 06 Image.jpg
View fullsize 07 Image.jpg
View fullsize 08 Image.jpg
View fullsize 10 Image.jpg
View fullsize 09 Image.jpg

Complete Refurbishment of Concourse Retail for Network Rail

Robinson Kenning & Gallagher were appointed by Balfour Beatty to provide Grip 4 to 8, multi-discipline design and technical site support for the complete refurbishment of the Station retail facilities. Included in the works was the provision of a new 1,200m² mezzanine floor to facilitate a selection of new dining outlets and customer seating areas. 

Detailed design development included: consideration for shopper and passenger movement between the new mezzanine and existing Station facilities, the declutter of the Station concourse and the conversion of the existing piazza and food court areas. 

Sited over the main station concourse and busy LUL escalators, working alongside the live Station environment, the passenger safety and continuity of Station operations was paramount. In total fifteen new retail units were provided as part of the refurbishment scheme.

Project Value: £9m


OTHER ACCESS FOR ALL CASE STUDIES:

Featured
Bristol Temple Meads Eastern Entrance, Bristol
Bristol Temple Meads Eastern Entrance, Bristol
Read more →
Paddington Station: Reception, London
Paddington Station: Reception, London
Read more →
Bury St. Edmunds Station (Cycle Hub), Suffolk
Bury St. Edmunds Station (Cycle Hub), Suffolk
Read more →
Cambridge CyclePoint, Cambridge
Cambridge CyclePoint, Cambridge
Read more →
Amersham Station, Buckinghamshire
Amersham Station, Buckinghamshire
Read more →
Harrow-on-the-Hill, Harrow
Harrow-on-the-Hill, Harrow
Read more →
St Erth, Cornwall
St Erth, Cornwall
Read more →
Stoke MDU, Stoke
Stoke MDU, Stoke
Read more →
Bury St. Edmunds Station, Suffolk
Bury St. Edmunds Station, Suffolk
Read more →
Purley Station, Croydon
Purley Station, Croydon
Read more →
Dartford Station, Kent
Dartford Station, Kent

Initial concept design Grip Stage 5 working drawings of a New Major Interchange Station at Dartford, incorporating new retail, passenger and station staff administration facilities. In association with the scheme the existing car parking was also developed to increase the number of parking spaces and improve Disabled parking and its proximity to the new station.

Read more →
Earlsfield Station, Wandsworth
Earlsfield Station, Wandsworth

Earlsfield Station is the busiest small station in London, experiencing huge volumes of passenger flow during peak hours.

Read more →
Basingstoke Station, Hampshire
Basingstoke Station, Hampshire

Robinson Kenning & Gallagher prepared scheme proposals, working drawings, and invitation to tender documents for the development of this South West Trains flagship station at Basingstoke. RKG were also employed to act as Project Managers and Supervisors under the NEC 3 contract.

Read more →
Euston Station: Concourse, London
Euston Station: Concourse, London
Read more →
Cycle Hubs, South West England
Cycle Hubs, South West England

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more →
London Bridge: Maintenance Facility, London
London Bridge: Maintenance Facility, London

Robinson Kenning & Gallagher were employed from Grip stage 2 ñ 8 working closely with Balfour Beatty Rail, Network Rail and the End User.

Read more →
Clapham Junction Station: Brighton Yard, London
Clapham Junction Station: Brighton Yard, London

This original entrance to the station had become congested and the pedestrian flow of passenger through the subway was being restricted by the existing gateline and limited circulation space.

Read more →
Southampton Station, Hampshire
Southampton Station, Hampshire
Read more →
Kensal Rise and South Tottenham Overground Stations, London
Kensal Rise and South Tottenham Overground Stations, London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the station. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Paddington Station: Waiting Room, London
Paddington Station: Waiting Room, London

RKG were employed to produce the architectural detailed design and Form 003 submission along with the overall coordination of Structural, Mechanical & Electrical †and Signage for the new public waiting room.

Read more →
Clapham Junction: St John's Hill Entrance, London
Clapham Junction: St John's Hill Entrance, London
Read more →
Charing Cross Station, London
Charing Cross Station, London
Read more →
Clapham Junction: Platform 9/10, London
Clapham Junction: Platform 9/10, London
Read more →
Worcester Park and New Malden Stations,  Kingston upon Thames
Worcester Park and New Malden Stations, Kingston upon Thames

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the stations. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Ilford Station: Public Toilets & Waiting Room, London
Ilford Station: Public Toilets & Waiting Room, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
Kings Cross Station: Roof, London
Kings Cross Station: Roof, London

Robinson Kenning & Gallagher produced a Listed Building Application with WYG on behalf of our clients Network Rail. Network Rail is proposing to refurbish and upgrade Kings Cross Station. This Application related to the proposed renewals work and specifically to the Main Train Shed which comprises of two separate barrels roof separated by a central spine wall.

Read more →
Victoria Station: Eastern Barrel Roofs, London
Victoria Station: Eastern Barrel Roofs, London

Robinson Kenning & Gallagher acted as Heritage consultants for the mains contractor for the re-roofing of the Eastern Kent side Concourse of London Victoria Station.

Read more →
Blackhorse Road Station, Waltham Forest
Blackhorse Road Station, Waltham Forest

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
categories: Transport, Access for All
Monday 08.12.19
Posted by Kevin Stocker
 

Cycle Hubs, South West England

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more

categories: Transport
Sunday 08.11.19
Posted by 3B Digital
 

London Bridge: Maintenance Facility, London

Robinson Kenning & Gallagher were employed from Grip stage 2 ñ 8 working closely with Balfour Beatty Rail, Network Rail and the End User.

Read more

categories: Transport
Saturday 08.10.19
Posted by 3B Digital
 

Clapham Junction Station: Brighton Yard, London

This original entrance to the station had become congested and the pedestrian flow of passenger through the subway was being restricted by the existing gateline and limited circulation space.

Read more

categories: Transport, Access for All
Friday 08.09.19
Posted by 3B Digital
 

Southampton Station, Hampshire

Entrance Improvements, New Concourse and Upgraded Passenger Facilities and Forecourt

A National Station Improvement Project (NSIP) for Network Rail on behalf of South West Trains (SSWT). Robinson Kenning & Gallagher designed a new fully DDA compliant Station entrance, enlarged booking hall and new ticket office counters. Other improvements included a new passenger lounge and toilet areas, dedicated customer information counter and improved circulation arrangements with the retail unit. New facilities were also designed for the TOC (Train Operating Company) train crew.

RKG were appointed to provide Grip 3 and 4 Design Development. Feasibility options improved the poor access arrangements around the Station entrance and enhanced both passenger and retail amenities. RKG completed Grip 5 Design and site support works for Osborne based on a tight construction programme. The new Station entrance works (the 250th NSIP Project) were in keeping with the Art Deco styling of the station and were well received by the Client. The Station was re-opened by the Secretary of State for Transport.

View fullsize 02 Image.jpg
View fullsize 01 Image.jpg
View fullsize 03 Image.jpg
View fullsize 04 Image.jpg
View fullsize 05 Image.jpg
View fullsize 06 Image.jpg
View fullsize 07 Image.jpg
View fullsize 08 Image.jpg
View fullsize 09 Image.jpg
View fullsize 10 Image.jpg

OTHER ACCESS FOR ALL CASE STUDIES:

Featured
Bristol Temple Meads Eastern Entrance, Bristol
Bristol Temple Meads Eastern Entrance, Bristol
Read more →
Paddington Station: Reception, London
Paddington Station: Reception, London
Read more →
Bury St. Edmunds Station (Cycle Hub), Suffolk
Bury St. Edmunds Station (Cycle Hub), Suffolk
Read more →
Cambridge CyclePoint, Cambridge
Cambridge CyclePoint, Cambridge
Read more →
Amersham Station, Buckinghamshire
Amersham Station, Buckinghamshire
Read more →
Harrow-on-the-Hill, Harrow
Harrow-on-the-Hill, Harrow
Read more →
St Erth, Cornwall
St Erth, Cornwall
Read more →
Stoke MDU, Stoke
Stoke MDU, Stoke
Read more →
Bury St. Edmunds Station, Suffolk
Bury St. Edmunds Station, Suffolk
Read more →
Purley Station, Croydon
Purley Station, Croydon
Read more →
Dartford Station, Kent
Dartford Station, Kent

Initial concept design Grip Stage 5 working drawings of a New Major Interchange Station at Dartford, incorporating new retail, passenger and station staff administration facilities. In association with the scheme the existing car parking was also developed to increase the number of parking spaces and improve Disabled parking and its proximity to the new station.

Read more →
Earlsfield Station, Wandsworth
Earlsfield Station, Wandsworth

Earlsfield Station is the busiest small station in London, experiencing huge volumes of passenger flow during peak hours.

Read more →
Basingstoke Station, Hampshire
Basingstoke Station, Hampshire

Robinson Kenning & Gallagher prepared scheme proposals, working drawings, and invitation to tender documents for the development of this South West Trains flagship station at Basingstoke. RKG were also employed to act as Project Managers and Supervisors under the NEC 3 contract.

Read more →
Euston Station: Concourse, London
Euston Station: Concourse, London
Read more →
Cycle Hubs, South West England
Cycle Hubs, South West England

Robinson Kenning & Gallagher prepared listed building and permitted development proposals, working drawings, and invitation to tender documents for the development of this South West Trains new Cycle Hubs at 8no Stations.

Read more →
London Bridge: Maintenance Facility, London
London Bridge: Maintenance Facility, London

Robinson Kenning & Gallagher were employed from Grip stage 2 ñ 8 working closely with Balfour Beatty Rail, Network Rail and the End User.

Read more →
Clapham Junction Station: Brighton Yard, London
Clapham Junction Station: Brighton Yard, London

This original entrance to the station had become congested and the pedestrian flow of passenger through the subway was being restricted by the existing gateline and limited circulation space.

Read more →
Southampton Station, Hampshire
Southampton Station, Hampshire
Read more →
Kensal Rise and South Tottenham Overground Stations, London
Kensal Rise and South Tottenham Overground Stations, London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the station. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Paddington Station: Waiting Room, London
Paddington Station: Waiting Room, London

RKG were employed to produce the architectural detailed design and Form 003 submission along with the overall coordination of Structural, Mechanical & Electrical †and Signage for the new public waiting room.

Read more →
Clapham Junction: St John's Hill Entrance, London
Clapham Junction: St John's Hill Entrance, London
Read more →
Charing Cross Station, London
Charing Cross Station, London
Read more →
Clapham Junction: Platform 9/10, London
Clapham Junction: Platform 9/10, London
Read more →
Worcester Park and New Malden Stations,  Kingston upon Thames
Worcester Park and New Malden Stations, Kingston upon Thames

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the stations. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more →
Ilford Station: Public Toilets & Waiting Room, London
Ilford Station: Public Toilets & Waiting Room, London

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
Kings Cross Station: Roof, London
Kings Cross Station: Roof, London

Robinson Kenning & Gallagher produced a Listed Building Application with WYG on behalf of our clients Network Rail. Network Rail is proposing to refurbish and upgrade Kings Cross Station. This Application related to the proposed renewals work and specifically to the Main Train Shed which comprises of two separate barrels roof separated by a central spine wall.

Read more →
Victoria Station: Eastern Barrel Roofs, London
Victoria Station: Eastern Barrel Roofs, London

Robinson Kenning & Gallagher acted as Heritage consultants for the mains contractor for the re-roofing of the Eastern Kent side Concourse of London Victoria Station.

Read more →
Blackhorse Road Station, Waltham Forest
Blackhorse Road Station, Waltham Forest

Robinson Kenning & Gallagher were appointed as Architects for the scheme to provide detailed design for the new lifts and walkways.

Read more →
categories: Transport, Access for All
Thursday 08.08.19
Posted by Kevin Stocker
 

Kensal Rise and South Tottenham Overground Stations, London

Morgan Sindall were appointed Principal Contractor for the proposed Access for All works at the station. Robinson Kenning & Gallagher were appointed as Architects for the scheme.

Read more

categories: Transport, Access for All
Wednesday 08.07.19
Posted by 3B Digital
 

Paddington Station: Waiting Room, London

RKG were employed to produce the architectural detailed design and Form 003 submission along with the overall coordination of Structural, Mechanical & Electrical †and Signage for the new public waiting room.

Read more

categories: Transport
Tuesday 08.06.19
Posted by 3B Digital
 
Newer / Older